Roof Tiling and More Grass

Once the roof was finished being laid, it was time to tile it. It was at this point I discovered the side roof sections of the main building weren't as strong as I thought they were. Each time I pressed a tile down, the roof would cave a little. I removed all the tiling that was previously snapped in place, reinforced the roof sections and then laid the tile back down.

The edging (what I call the gutters) was finished at this time too.

The side roof sections of the temple's main building have some equipment on them. I'm not sure what it is. I raised those sections of the roof, which gave the roof line a nice detail.

The "grass" around the model was finished along with more of the sidewalk. 








No comments:

Post a Comment

Why the Los Angeles Temple